The Challenge
A Dublin office moving into a new shell-and-core unit needed a complete electrical fit-out — including power distribution, high-efficiency LED lighting controls, data infrastructure and mandatory emergency lighting — completed within a tight deadline before staff moved in.
The AH Electrical Solution
- Full power distribution including underfloor trunking and perimeter desk power sockets
- High-efficiency LED lighting designed and installed throughout
- Occupancy sensors and daylight harvesting controls to minimise energy use
- Emergency lighting installed and certified to IS 3217 standard
- Cat6 data cabling throughout to every workstation and server room
- Distribution board upgraded for new commercial load
The Result
"Professional, on time, and within budget — exactly what we needed for our new office."
- Office Manager, Dublin
Office completed on schedule. Emergency lighting certified to IS 3217. Energy consumption significantly lower than previous tenants. ACA tax incentive claimed on LED equipment.