The Challenge
A dairy farmer in Co. Kilkenny needed to significantly reduce operational energy costs, particularly for milk cooling equipment running during expensive peak hours. The existing single-phase supply was also insufficient for the farm's growing power demands and machinery.
The AH Electrical Solution
- Upgraded farm power supply from single-phase to balanced 3-phase
- Designed and installed roof-mounted Solar PV array on dairy shed
- All wiring to IP-rated specification for agricultural and moisture-rich environment
- Battery storage integrated to maximise self-consumption during overnight milking
- Completed full TAMS III grant documentation and SEAI MSC Audit
- RECI Completion Certificate issued
The Result
"The job was completed on time and within budget — a massive help with the grant paperwork too. Fantastic service."
- Dairy Farmer, Co. Kilkenny
Farm energy costs reduced significantly. 3-phase supply now meets all machinery requirements. TAMS III grant of significant value successfully claimed. Milking systems now powered by solar during daylight hours.
TAMS III Grant Claimed
Inspired by this project?
Get a Quote for a Similar Project